- Tata
Power, Trombay with 500 MW capacity one of its kind put
up in India
- ONGC,
GOI for its Mechanical Design and Analysis of Crude Columns
of Tatipaka Refinery, par ASME Section VIII code. The tallest
column with a height of 38 metre and SS body were supported
at different levels to mitigate the effect of severe wind and
earthquake and achieve optimum wall thickness.
|
- Indian
Oil Corporation Limited for erection of Coker Heater at
Barauni with a capacity of 1,43,000 kg/Hr crude oil.
- Nuclear
Power Plant, Kaiga for installation of pipes & piping
systems in Balance of Plant, Auxiliary building and Reactor
building of Kaiga Nuclear Plant. The work required compliance
with very stringent codes and standards pertaining to Nuclear
Industry.
- Gas
Gathering Station, ONGC, Odalarevu for design, fabrication,
erection with process guarantee manufacturing pressure vessels
of pressure as high as 99 bar with wall thickness of 70 mm.
- Durgapur
Steel Plant for its Blast Furnace, Steel Melting Shops and
Rolling Mills
- TISCO,
Jamshedpur - total solution for its Oxygen Enrichment Project
and D-Blast Furnace.
- Rourkela
Steel Plant of Steel Authority of India - computerized auto
bending and specialized welding of LCD Converter assignment
with single axis pipe bender.
|
|