| Sl.
No. |
Client |
Project |
Contract
Value (Rs. in lakhs) |
Completion |
| |
METAL |
|
|
|
| 1. |
Jindal Steel & Power Limited, Raigarh |
Fabrication & Erection of Technological Structures, Equipment Erection Trial-run & Commissioning Work in 3 Nos. x 330 TPD Limestone & Dolomite Calcining Plant Project at JSPL, Raigarh. |
2540.00 |
March 2007 |
| 2. |
The Tata Iron & Steel Co. Ltd., Jamshedpur |
Design & Engineering, supply, erection, testing and commissioning of Lime Kiln No.6 under 1 Million Tonne Expansion Programme. |
700.50 |
March 2005 |
| 3. |
Bharat Aluminium Company Limited, Korba |
Supply, InstallationDesign, Engineering, Erection & commissioning of HP/LP Steam Piping System and Fuel Oil Handling System for 540 MW CPP Project at BALCO, Korba |
1850.00 |
Fuel Oil–June-05
LP Process-Mar-05
HP Process-Sep-05 |
| 4. |
Bharat Aluminium Company Limited, Korba |
Design, Engg., Procurement of matls, statutory approvals and licenses, supply, fabrication, erection/installation, of Thermal Piping System with accessories for 245,000 TPA Aluminium Smelter Project at Korba. |
903.47 |
June 2005 |
| 5. |
Bharat Aluminium Company Limited, Korba |
Design, Engg., Procurement of matls, statutory approvals and licenses, supply, fabrication, civil work erection /installation, of Complete Water Piping System with accessories for Inplant Piping System, Circulating Water System and Inshop Piping work. |
1429.29 |
April 2005 |
| 6. |
Sterlite Industries (India) Ltd., Tuticorin, Tamil Nadu |
Supply, Fabrication, Erection, Testing and Commissioning of Utility Piping, Refinery Erection and Utility Erection Packages. |
1090.94 |
March 2004 |
| 7. |
SAIL – BSP |
Steamline of PH Degasser Unit of SMS-II, Bhilai Steel Plant. |
158.00 |
April 2000 |
| 8. |
Southern Iron and Steel Co. Ltd., Potteneri near Mettur |
Supply, Fabrication, Erection, Testing and Commissioning of pipeline and supports (for quality steam compressed air furnace oil etc.) |
585.00 |
May 1999 |
| 9. |
Jindal Vijayanagar Steel Ltd., Toranagallu, Bellary Dist. Karnataka |
Supply, Fabrication, Erection and Commissioning of Corex Tower-1 Utility Piping System like critical & non-critical cooling water, Oxygen, Nitrogen, Corex Gas, Compressed Air, LPG, Fire Fighting etc. |
2400.00 |
November 1998 |
| 10. |
Birla Copper (A Unit of Indo Gulf Fertilisers and Chemicals Corporation Limited), Mumbai |
Supply of various Pipeline for Copper Smelter Project at Dahej |
330.00 |
January 1998 |
| 11. |
Hyundai Engineering & Construction Co. Ltd., Sriperumbudur, T.N. |
Erection of Utility equipment and piping at Hyundai Motor Car Project at Sriperumbudur |
840.00 |
July - 1998 |
| 12. |
TATA Steel, Jamshedpur |
a) Design & Engg. of Oxygen Injection System for Oxygen Enrichment Project for `A’ to `F’ Blast Furnaces.b) Supply of Oxygen Injection System for Oxygen Enrichment Project for `A’ to `F’ Blast Furnaces.c) Erection & Commissioning of Oxygen Injection System for Oxygen Enrichment Project for `A’ to `F’ Blast Furnaces. |
536.00 |
March 1998 |
| |
POWER |
|
|
|
| 1. |
The Tata Power Company Limited, Jojobera |
Supply, Engineering, Installation and Commissioning of 120 MW Jojobera Unit-4 Balance of Plant |
3432.00 |
January 2006 |
| 2. |
Tata Power Co. Ltd., Jojobera |
Supply of Equipment, erection and commissioning of pipeline for Ash Slurry Disposal and Ash Water Recovery System at JEMCO. |
447.81 |
February 2003 |
| 3. |
TATA POWER CO. LTD., JOJOBERA |
Design, Engineering, Supply and Erection of HP, LP and FP Systems |
1500.00 |
May 2002 |
| 4. |
NPC – Kaiga |
Supply, Fabrication, Erection, Testing and Assistance during Commissioning of Secondary Cycle Piping Package for Kaiga Atomic Power Project, Kaiga Units 1 & 2 |
1100.00 |
June 2000 |
| |
FERTILIZER |
|
|
|
| 1. |
PDIL – NAMRUP |
Erection of 1st Distiller for Urea Plant of Namrup-III including allied civil/structural, A/G piping, painting & insulation of equipment, piping, electrical and instrumentation work. |
123.00 |
March 2002 |
| 2. |
Brahmaputra Valley Fertilizers Corporation Ltd., Namrup, Assam |
Civil, Structural, Piping, Equipment, Electrical, Instrumentation works etc. |
2570.12 |
April 2005 |
| |
PETROCHEMICALS |
|
|
|
| 1. |
Oil and Natural Gas Corpn. Ltd., Chennai |
Supply, fabrication and erection of Onshore Piping including supply and erection of critical equipments at Odalarevu near Rajamundry |
654.00 |
May 2000 |
| 2. |
HPL – Haldia |
Equipment Erection and Piping works for Integrated Offsite Project for Haldia Petrochemicals Project at Haldia (Part-B) |
612.00 |
February 2000 |
| 3. |
IOCL – Barauni |
Fabrication, Erection & Insulation of 02 (two) Nos. of Cabin Type Heaters (Excluding Shell & Structure) with Stack and APH System of Coker-A |
347.00 |
January 2000 |
| 4. |
IOCL – Digboi Refinery |
Fabrication and Erection of Above Ground Piping, Erection of Equipment, Machineries and other related Civil and Structural works for Wax Hydrofinishing Unit at Digboi |
186.00 |
April 1999 |
| 5. |
Numaligarh Refinery Ltd. |
- Erection of Vessels and Columns (HN/KERO/GAS/OIL STRIPPER, NAPTHA STABILISER AND DESALTER) and other Static Equipment, like Heat Exchangers, Trays, Valves etc. and Rotating Equipment like Pumps & Motors and Fabrication & Erection of Carbon Steel, Alloy Steel and Stainless Steel Piping, Structurals etc. for CDU/VDU Unit.
- Erection of Static Equipment like Columns, Vessels, Trays and Rotating Equipment like, Pumps, Motors etc., Fabrication and Erection of Offsites Piping (Part-A & Part-B)
- Erection of Static Equipment like Columns, Vessels, Tanks, Filters, Drums, Heat Exchangers, Waste Heat Boiler etc. and Rotating Equipment like, Pumps, Fabrication & Erection of Carbon Steel, Alloy Steel and Stainless Steel Piping, Jacketed Piping, Steam Tracer and associated Civil & Structural Work for Sulphur Recovery Unit.
|
1700.00 |
March 1999 |
| 6. |
Indian Oil Corporation Limited, Panipat Refinery, Panipat |
Fabrication of Equipment & Machinery and Fabrication & Erection of A/G & U/G Piping and connected Civil & Structural Works for Offsites & Utilities |
600.00 |
June 1998 |